Diaphragm wall work in the Surrey

Aiming high

Our experts at Bauer Foundations Canada were contracted to design and construct an excavation pit and foundations for a new nine storey hospital with two levels of underground parking in Surrey British Columbia. The details: Using BAUER’s MC 96 duty cycle cranes with a cable grab and BC 48 trench cutter, 435 linear metres of polymer supported diaphragm wall was installed up to 23 m in depth along with 256 foundation barrettes to a depth of 27.5 m. Team effort: With excellent planning and collaboration, we poured concrete elements for 130 days straight to reach an overall total of 30,000 m3 of concrete and 7,000 tons of steel.

Facts about the project
Company :

BAUER Foundations Canada Inc

Location :

18050 James Hill Drive, Surrey, British Columbia

Project name :

New Surrey Hospital         

Period :

December 2023 to September 2024

Services :

Excavation pits, Foundation piles, Two-phase Diaphragm wall, Barrettes

Supporting Healthcare in Surrey

Diaphragm wall installation with MC 96 duty cycle crane and BC 48 cutter by Bauer Foundations Canada
Diaphragm wall installation with MC 96 duty cycle crane and BC 48 cutter by Bauer Foundations Canada
Aerial view of the storage area and construction site for New Surrey Hospital by Bauer Foundations Canada
Aerial view of the storage area and construction site for New Surrey Hospital by Bauer Foundations Canada
Partial excavation of the New Surrey Hospital by Bauer Foundations Canada

Despite the intense schedule, we were able to successfully complete the project through excellent teamwork and collaboration from all parties.”

Taylor Steele
Project Manager